Login für Abonnenten

Please log in to read subscribed content.




  • Content
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter
wire
wire
  • Reports
  • Business
  • Research + Development
  • Products
  • Whitepaper
  • Call umformtechnik.net
  • Issues digital
search.box
  • Content
    • Reports
    • Business
    • Research + Development
    • Products
    • Whitepaper
    • Call umformtechnik.net
    • Issues digital
  • Events Calendar
  • Editorial team
  • Subscription
  • Media
  • Newsletter

29/05/2019

Speedy production buffer for 3,000 tons of steel wire coils

Vollert has erected for Saarstahl Neunkirchen a fully automatic high-bay warehouse for up to 665 steel wire coils. The time is 190s per double cycle. The coils weighing up to 4.5 tons are transferred directly from the stacker crane to the lift truck and on to the truck loading.

Previous image Next image
2.jpg

© Vollert

 
1.jpg

© Vollert

 
2.jpg

© Vollert

 
3.jpg

© Vollert

 
4.jpg

© Vollert

 
Back to article

Further articles for:

  • Saarstahl
  • Vollert

Saarstahl AG

  Show company
  • Most read
  • Latest
  • Meisenbach Verlag
  • Imprint
  • Data Privacy
  • Media
  • Twitter
  • RSS Feed
Meisenbach Logo